Tianjin Longlong Metal Products Factory

home products Cold Bending Molding Equipment Drywall Metal Stud Roll Forming Machine

Drywall Metal Stud Roll Forming Machine

Drywall Metal Stud Roll Forming Machine

Product Details:

Machine Type Roll Forming Machine
Automation Automatic
Extra Services Cut To Length
Certification ISO 9001:2000
Power Hydraulic
Raw Material steel
Material / Metal Processed steel
Certification ISO9001:2000
Place of Origin Tianjin, China
Brand Name LongLong
Model Number MODEL NO. LL-CL55-12

Payment & Shipping Terms:

Minimum Order Quantity: 1 Set/Sets
Price: FOB XinGang Port TianJin USD 15000~30000
Packaging Details: wire netting protection,steel rack with wood board reinforcement,suitable for long distance
Delivery Time: within 40 days, after receiving the deposit
Payment Terms: L/C,T/T
Supply Ability: 30 Set/Sets per Month

Detailed Product Description


Detail information of the Dry - wall Metal Stud Roll Forming machinen as follows:

Model no.: LL-CL55-12C

() The production line major technical parameters

1 The use of raw materials: hot dip galvanized steel strip, cold-rolled steel plate

2 Rolling material thickness: 0.35-2.0 mm

3 Feeding width: 300mm

4 The steel coil inner diameter 508mm-600mm

5 Steel coil outer diameter: 1200mm

6 Molding host motor: electromagnetism timing motor 5.5 kw

7 Working voltage: 380V 50hz   control voltage 24v

8 Molding host composed by 12 axis

9 Molding host adopts welded steel structure

10 The transmission way: gear (gear materials selecting 45 # steel processing, surface with high frequency.

11 The roller adopts 45 # steel thermal refining, surface abrasive grinding, modulation hardne HB250 280, roller diameter 55mm

12 Roller mould adopts bearing steel( Gcr15 ) salt bath quenching hardness HRC58- 62

13 Production speed: 5-22 meters per minute

14 The maximum error metal stud molding 0.35 mm

15 Feeding direction from left to right

() Cutting off device

1 Hydraulic as power cut: Cutting off ability 8 tons

2 Hydraulic pressure system pressure12MPA work pressure 6MPA

3 Cut off form : 45 degrees inclined cutting, cutting waste 0mm

4 Cutting stander adopts steel frame welding

5 Cutting off mold adpots special mold steel CR12, Salt bath quenching hardness HRC60-62

6 Scale length error less than 2.0 mm

(decoil) feeding organization

1 Steel structure welding framework

2 Using hand up tight

3 Maximum load 18,000 tons

() The whole production line composition

Vertical feeding organization - material right and left guide material leverer molding hostroller moldfinished goods straightener, hydraulic pressure cutting off device (hydraulic station) -- tracing cut off walking car cutting off mold - accept feeder-- electric control box

() Production cycle: after receiving of the contract prepayment, within 35 days, deliver the goods.

() Equipment acceptance, manufacturers train debugging method: Buyer comes to the factory of the sellers to learn, examine the equipment, room and board undertook by manufacturer, consignment after the examination is passed.

The specification which the production line can produce.

QC50 QC75 QC100 QU50 QU75 QU100 DU38. DU50 DC50

Dry - wall Metal Stud Equipment

Equipment models LL-CL55-12C

() The production line major technical parameters

1 The use of raw materials: hot dip galvanized steel strip, cold-rolled steel plate

2 Rolling material thickness: 0.35-2.0 mm

3 Feeding width: 300mm

4 The steel coil inner diameter 508mm-600mm

5 Steel coil outer diameter: 1200mm

6 Molding host motor: electromagnetism timing motor 5.5 kw

7 Working voltage: 380V 50hz   control voltage 24v

8 Molding host composed by 12 axis

9 Molding host adopts welded steel structure

10 The transmission way: gear (gear materials selecting 45 # steel processing, surface with high frequency.

11 The roller adopts 45 # steel thermal refining, surface abrasive grinding, modulation hardne HB250 280, roller diameter 55mm

12 Roller mould adopts bearing steel( Gcr15 ) salt bath quenching hardness HRC58- 62

13 Production speed: 5-22 meters per minute

14 The maximum error metal stud molding 0.35 mm

15 Feeding direction from left to right

() Cutting off device

1 Hydraulic as power cut: Cutting off ability 8 tons

2 Hydraulic pressure system pressure12MPA work pressure 6MPA

3 Cut off form : 45 degrees inclined cutting, cutting waste 0mm

4 Cutting stander adopts steel frame welding

5 Cutting off mold adpots special mold steel CR12, Salt bath quenching hardness HRC60-62

6 Scale length error less than 2.0 mm

(decoil) feeding organization

1 Steel structure welding framework

2 Using hand up tight

3 Maximum load 18,000 tons

() The whole production line composition

Vertical feeding organization - material right and left guide material leverer molding hostroller moldfinished goods straightener, hydraulic pressure cutting off device (hydraulic station) -- tracing cut off walking car cutting off mold - accept feeder-- electric control box

() Production cycle: after receiving of the contract prepayment, within 35 days, deliver the goods.

() Equipment acceptance, manufacturers train debugging method: Buyer comes to the factory of the sellers to learn, examine the equipment, room and board undertook by manufacturer, consignment after the examination is passed.

The specification which the production line can produce.

QC50 QC75 QC100 QU50 QU75 QU100 DU38. DU50 DC50

图片

Drywall Metal Stud Roll Forming Machine

Send your message to this supplier
« Prev Product 1 2 3 4 5 6 7 ... Next Product »

Other Products from this Supplier

Company Info

Tianjin Longlong Metal Products Factory
[China]
[Verified Member]

City: Tianjin
Province/State: Tianjin
Country/Region : China

Business Type:Manufacturer, Trading Company, Distributor/Wholesaler

View Contact Details

Email this page Bookmark this page Print this Page